Just coming back from Jakarta. Spent 2 days meeting with Sarku-Tripatra Consortium & Star Energy Indonesia. The technical meeting is about;
- Installation of 500m 6″ Rigid pipeline (Original design was Flexible Flowlines) from KRA-2x Subsea wellhead to KRA-S (South) subsea wellhead.
- Installation of 4 nos of spools tie in at KRA-2x & KRA-S
- Pre-Commissioning of the newly installed 6″ line.
- Assistance during introduction of hydrocarbon to the newly installed pipeline.
Looking forward to execute the job since i’ve never been working in Natuna field before.