Offshore Platform Installation

Good Overview on Jacket and topside installation

From time to time, i’ll be writing about the sequence of Offshore Facilities installation especially Jacket and Topside.  The documentation related to these activities will be the basis.  For each item i’ll write in detail but as much the layman should be able to understand.  List below the potential articles and detail about these operations.  

Jacket Transportation Study Study Based On  Barge (330 Class)
Piles, Conductors, Boatlanding, Trans. Piece & Riser Guard Transportation Study Based On Sea Foster
Topside Transportation Study Based On Material Barge  (330 Class)
Topside Transportation Study Based on Material Barge  (460 Class)
Pile & Conductors Driveability Study
Jacket On Bottom Stability Analysis
Jacket Upending Study
Conductor Hang Off Study
Loadout Coordination Manual For Jacket
Loadout Coordination Manual For Topside
Jacket Rigging Calculation
Topside Rigging Calculation
Jacket Installation Procedure
Topside Installation Procedure
Pre Installation Survey Report
Construction Risk Assessment (CRA)
Construction Risk Assessment (CRA)
As- Built Report Structure

You are invited to provide feedback and details and even maybe articles for some of the above items.  Any inputs, comment and feedback will be highly appreciated.

OffshoreMan


Source link

Comments